• About
  • Advertise
  • Careers
Wednesday, November 18, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

14,600 teus of average backlog at Chittagong Port

by Maritimegateway
July 14, 2021
in News
Reading Time: 2 mins read
A A

The five-day average of export container backlog in Chattogram off-docks stood at 14,636 twenty-foot equivalent units (TEUs) on Tuesday.

This is much higher than the normal average backlog of around 6,000 TEUs in the depots a day.

However, export backlog stood at 15,314 TEUs on Tuesday, down by 219 TEUs from Monday.

Exporters or shippers said they needed extra 10-15 days on an average for making their shipments due to the backlog.

They also said they had been counting demurrage each day for the situation.

In the meantime, the Chittagong Port Authority (CPA) organised a meeting with the port users on Monday to resolve the crisis that was never seen in the recent past.

RelatedPosts

New post style guide

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

The CPA took some decisions for easing the crisis, which included, among others, to force shipment of 20-foot export-laden containers from the port yards.

As of Tuesday, a total of 30,430 TEUs of empty containers, including 10,053 TEUs of 40-foot containers, remained stockpiled in 17 depots, according to the Bangladesh Inland Container Depots Association (BICDA), a group of 19 off-docks in Chattogram.

According to many shipping experts, the present backlog has been caused by lack of pre-assigned feeder vessels, connecting the port. The feeder vessels transport cargoes to the mother vessels in Port of Colombo or Port of Singapore to send those to the US and Europe.

There are a total of 19 off-docks in Chattogram, of which 17 are in operations now. These depots are considered as extensions of the port, as their functions facilitate the port activities.

The off-docks, having an aggregate storing capacity of 77,700 TEUs, handle cent per cent export and 25 per cent import of Bangladesh.

Source : The Financial Express

Tags: chittagong Port|port news
Previous Post

JinkoSolar in cooperation with Maersk

Next Post

Design work and tendering process for ECT

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post

Design work and tendering process for ECT

Follow Maritime gateway

    Popular News

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Haryana CM flags off first goods train

    Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

    August 24, 2026
    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

    October 10, 2026

    Business

    No Content Available

    recent

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Edgistify Adds 68,000 Sq Ft Warehouse

    Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

    October 16, 2026
    National Strategic Trade Command Centre Opens

    National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

    October 16, 2026
    India’s Merchandise Exports Rise 23%

    India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

    October 16, 2026

    Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Follow Us

    © 2026 – Powered by .

    • Terms of Use
    • Privacy Policy
    • Manage Cookies
    • License
    No Result
    View All Result
    • Home

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.