• About
  • Advertise
  • Careers
Thursday, October 22, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Government
    • Customs & Border Regulations
    • Maritime & Shipping Economy
    • EXIM & International Trade
    • Government Policy & Regulation
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Government
    • Customs & Border Regulations
    • Maritime & Shipping Economy
    • EXIM & International Trade
    • Government Policy & Regulation
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

VOC Port Pushes Outer Harbour HAM Tender Deadline to 23 October

by Maritime Gateway
October 13, 2026
in News, Government, Ports & Terminals
Reading Time: 3 mins read
A A
VOC Port Pushes Outer Harbour HAM Tender Deadline to 23 October

Summary

V.O. Chidambaranar Port Authority has extended the deadline for its ₹9,859.45 crore Outer Harbour HAM tender. Under Corrigendum 26, bids are now due on 23 October, with opening on 24 October. The global tender covers the core marine infrastructure needed for the proposed Outer Harbour at Thoothukudi.

Article

Thoothukudi: V.O. Chidambaranar Port Authority has extended the bid submission deadline for the VOC Port Outer Harbour HAM tender, the global tender for the core marine works of its proposed Outer Harbour in Thoothukudi, Tamil Nadu.

What has changed?

Corrigendum 26, published on 10 October, moves the bid submission date to 23 October. Bids will now be opened on 24 October.

What does the tender cover?

The tender is being run on a Hybrid Annuity Model (HAM) basis and covers the main marine and onshore works for the Outer Harbour. The scope includes:

  • Construction of breakwaters and a rock bund
  • Construction of a wharf
  • Capital dredging
  • Reclamation for the backup yard
  • Allied onshore works

What are the key tender details?

The tender ID is 2025_VOCPT_260720_1. It carries a stated value of ₹9,859.45 crore and a work period of 2,555 days, or about seven years.

Why does it matter?

This package is the core marine infrastructure required for the proposed Outer Harbour. Its completion is essential to unlock deeper-draught, higher-capacity container operations at the port. The revised dates give bidders more time before submissions close on 23 October.

RelatedPosts

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

FAQs

What is the new bid deadline for the VOC Port Outer Harbour HAM tender?

Bids are now due on 23 October, with opening on 24 October.

What is the value of the tender?

The stated value is ₹9,859.45 crore.

What works does the tender cover?

It covers breakwaters, a rock bund, a wharf, capital dredging, reclamation for the backup yard and allied onshore works.

How long is the work period?

The work period is 2,555 days.

Why is this tender important?

It is the core marine infrastructure package needed to enable deeper-draught, higher-capacity container operations at the proposed Outer Harbour.

Tags: HAMPProjectIndianPortsOuterHarbourPortInfrastructureVOCPort
Previous Post

Sahnewal-Mundiyampakkam Parcel Train Earns ₹15.63 Lakh on Maiden Run from Punjab

Next Post

PM Modi Launches ₹13,000 Crore Projects in Chennai, Spotlights VOC Port Mega Container Hub

Maritime Gateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
PM Modi Launches ₹13,000 Crore Projects in Chennai, Spotlights VOC Port Mega Container Hub

PM Modi Launches ₹13,000 Crore Projects in Chennai, Spotlights VOC Port Mega Container Hub

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026

Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Follow Us

© 2026 – Powered by .

  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License
No Result
View All Result
  • Home

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.