• About
  • Advertise
  • Careers
Friday, November 13, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

Many river routes abandoned due to lack of sufficient dredging

by Kalpana Pandey
April 18, 2023
in News, Asia, Inland Waterways, Logistics, Mainline Operators, Shipping, Supply Chain
Reading Time: 3 mins read
A A
Inland waterways 2

Although there are 41 recognised river routes between Dhaka and the south coast, at present there are commercial launches operating from Sadarghat terminal of Dhaka river port on just 25 routes. Bangladesh Inland Water Transport Authority sources have said that launches were not plying the remaining river channels due to the shortage of passengers.

However, launch owners say that 15 waterways have apparently been abandoned due to poor navigability. They said that this crisis had been created due to lack of sufficient dredging.

They claim that even on the 25 waterways that are operational, launches ply on just 19 of those. Launch movement on the remaining 6 routes is irregular.

Rights activists complain that there is no transparency and accountability in excavation and dredging works. Due to this, there are irregularities and corruption in this important work.

Launch owners also have the same complaint that waterways are not being dredged properly due to lack of transparency and accountability.

Badiuzzaman Badal, senior vice president of Bangladesh Inland Water Transport (passenger carrier) Association, an organisation of launch owners, said, ‘We are a major stakeholder in the shipping sector. But we are not involved in river dredging. Our opinion is not taken on which route has more or less navigability crisis.’

RelatedPosts

New post style guide

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

Referring to the lack of minimum transparency and accountability in dredging, Badiuzzaman Badal said, ‘BIWTA is doing the job as per their wish leading to widespread irregularities and corruption. As a result, general people, including water transport owners, are not getting the benefits. As the launch cannot proceed in many waterways due to the navigability crisis, in order to reach many destinations, one has to travel much more than the prescribed distance, wasting extra time. On the one hand, the fuel cost of the owners increases, on the other hand, the passengers do not want to board the launch because of the extra time wasted.’

Badiuzzaman Badal said these in a press conference at the organisation’s office at Sadarghat Terminal on April 8.

Aminur Rasul Babul, member secretary of Safe Waterway Implementation Movement, said that prime minister Sheikh Hasina herself was sincere in the development of inland shipping communication.

‘The government is also giving adequate allocation in this sector. But due to the irregularities and corruption of BIWTA’s dredging department, the desired success in rescuing the defunct waterways has not come even after 14 years,’ he added.

Mihir Biswas, joint secretary of Bangladesh Poribesh Andolon, said that BIWTA’s responsibility was to maintain the navigability of waterways through regular dredging under its revenue fund.

‘The river dredging, including rescue of lost waterways and the expensive works of silt removal, are under its development fund. The organisation has been doing these two tasks for more than a century. For this, thousands of crores of public funds have been spent, but the expected success is not visible,’ Mihir Biswas commented, also blaming irregularities, corruption and lack of accountability and transparency as responsible for this.

Tags: Bangladesh.inland waterways
Previous Post

Maitri Setu to be operational by June next year

Next Post

Bangladesh Shipping Corporation to expand fleet

Kalpana Pandey

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
Bulk tanker

Bangladesh Shipping Corporation to expand fleet

Follow Maritime gateway

    Popular News

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Haryana CM flags off first goods train

    Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

    August 24, 2026
    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

    October 10, 2026

    Business

    No Content Available

    recent

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Edgistify Adds 68,000 Sq Ft Warehouse

    Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

    October 16, 2026
    National Strategic Trade Command Centre Opens

    National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

    October 16, 2026
    India’s Merchandise Exports Rise 23%

    India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

    October 16, 2026

    Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Follow Us

    © 2026 – Powered by .

    • Terms of Use
    • Privacy Policy
    • Manage Cookies
    • License
    No Result
    View All Result
    • Home

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.