• About
  • Advertise
  • Careers
Friday, October 23, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
Global Shipping & Trade
Asia

VOC Port Authority’s outer harbour tender cancelled again amid lack of bidders

by Maritimegateway
June 12, 2025
in Asia, News, Ports & Terminals
Reading Time: 2 mins read
A A
#image_title

#image_title

VOC Port Authority’s ₹7,056 crore outer harbour project had to be called off as it failed to attract any bidders for the second time. The tender has been removed from the list of tenders available, as per sources. It could be restructured, they added.

In December 2024, The VOC Port Authority in Thoothukudi re-tendered the request for proposal (RFP) for project. The earlier tender was cancelled due to poor response – only two (Vedanta and Premier Science and Technology) applied and both were disqualified. The second time the eligibility criteria was modified to enable larger participation. However, it failed to attract bidders.

The project will involve dredging and construction of breakwater on design, build, finance, operate and transfer basis with a total handling capacity of 4 million TEUs (twenty foot equivalent units) per annum in two stages.

The indicative project cost of the first stage of 2 million TEUs is ₹4494 crore and involves development of container terminal 1 (berths I and II), dredging and construction of breakwater and other common project facilities. The second stage (2 million TEUs) will cost ₹2561 crore for developing container terminal-2 (berths III and to IV).

The port needs an outer harbour with the growing size of container ships in the past five years — lengths extending beyond 400 m and carrying capacity of nearly 22,000 twenty foot equivalent units (TEU) — whereas VOC port can handle only half this size.

Mere modernisation of the inner harbour and optimisation of existing berths cannot equip the port to handle the large vessels. An outer harbour is needed to meet future demand, says the detailed project report.

RelatedPosts

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

Tags: Ourter HarbourTenderVOC Port
Previous Post

Insurers face payouts for cargo lost in 2 maritime accidents

Next Post

SCI to launch coastal container service between Kandla and Tuticorin

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
SCI to launch coastal container service between Kandla and Tuticorin

SCI to launch coastal container service between Kandla and Tuticorin

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
Haryana CM flags off first goods train

Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

August 24, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
Haryana CM flags off first goods train

Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

August 24, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026

Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Follow Us

© 2026 – Powered by .

  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License
No Result
View All Result
  • Home

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.