• About
  • Advertise
  • Careers
Thursday, November 12, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

86% work on Chattogram Ring Road completed

by Maritimegateway
September 7, 2020
in News
Reading Time: 2 mins read
A A

Warning: Trying to access array offset on false in /home/u380631772/domains/thebestfirms.com/public_html/wp-content/themes/jnews/class/Image/ImageNormalLoad.php on line 70

Warning: Trying to access array offset on false in /home/u380631772/domains/thebestfirms.com/public_html/wp-content/themes/jnews/class/Image/ImageNormalLoad.php on line 73

September 7, 2020: The construction work of much-hyped Coastal Road known as Ring Road is in progresswith completion of almost 80 per cent of construction.

The rest work is expected to be completed within next six months. The ring road is likely to open to traffic next year, sources said.

The construction work remained suspended for several months due to the coronavirus outbreak. After the general holidays, the work resumed.

Project Director Engineer Kazi Hasan Bin Shams said, “86 per cent work of Ring Road has already been completed.”

“The construction work was hampered seriously during the general holidays announced by the government to contain the spread of coronavirus. We hope the project is likely to be completed next year, “said Hasan` Bin Shams, also Chief Engineer of Chattogram Development authority (CDA).

He added: “We are working to complete the work of connecting road now. After completing the connecting road, Ring Road will be opened formally in June next year.”

RelatedPosts

New post style guide

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

After completion of the project, sources said, the ring road will help protect Chattogram EPZ, Karnaphuli EPZ, Chattogram port, Shah Amanat International Airport, Naval and Air Force’s establishments and other key installations as well as the people of the area from natural calamities including tidal surge and cyclone.

Besides, traffic pressure in Chattogram city will be significantly reduced and industries especially tourism industry flourished after completing the project.

CDA is implementing the Coastal Road Construction and Embankment Strengthening project at a cost of Tk 14.96 billion.

The project was approved by the cabinet committee on government purchase on March 04 in 2016.

Under the project, a 15.2-kilometre road is being constructed on the existing coastal embankment connecting Patenga with Sagorika Industrial Area in the city. The road would strengthen the coastal embankment and raise its height from existing 23-24 feet to 33-34 feet.

According to the project, the 14.7-kmChattogramcity outer ring road comprising additional 5-km long two feeder roads and three approach roads will act as a strong coastal embankment-cum-four-lane highway stretching from Patengasea beach to Sagorika.

Of the two feeder roads, one will be constructed beside RAB-7 office at Kathgarh and another beside Zahur Ahmed Chowdhury Stadium at Sagorika. The height of the ring road will be around 31-33 feet.

Source: Financial Express

Tags: Chattogram Port Authority
Previous Post

Cochin Shipyard eyes opportunities in inland water, coastal, fishing vessel segments

Next Post

Expanding Bangladesh, India, Nepal rail connectivity to boost regional economy

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
Iran inaugurates railway that will transport cargo to Europe via Azerbaijan

Expanding Bangladesh, India, Nepal rail connectivity to boost regional economy

Follow Maritime gateway

    Popular News

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Haryana CM flags off first goods train

    Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

    August 24, 2026
    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

    October 10, 2026

    Business

    No Content Available

    recent

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Edgistify Adds 68,000 Sq Ft Warehouse

    Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

    October 16, 2026
    National Strategic Trade Command Centre Opens

    National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

    October 16, 2026
    India’s Merchandise Exports Rise 23%

    India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

    October 16, 2026

    Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Follow Us

    © 2026 – Powered by .

    • Terms of Use
    • Privacy Policy
    • Manage Cookies
    • License
    No Result
    View All Result
    • Home

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.