• About
  • Advertise
  • Careers
Monday, November 16, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

Green hydrogen generation will cost $15 billion for India

by Maritimegateway
September 14, 2026
in News
Reading Time: 2 mins read
A A

India will require an estimated $15 billion in public and private funding to set up 15 gigawatt (GW) of green hydrogenelectrolyser capacity by 2030, according to industry body, India Hydrogen Alliance (IH2A).

This electrolyser capacity is expected to produce 3 million metric tonnes (MMT) of green hydrogen and would need 30 GW of renewable energy.

IHA is an industry coalition of global and Indian firms committed to create a hydrogen value-chain and economy in India. These findings were presented by the industry body in the first of a six-part consultation series organised by NITI Aayog and the industry on green hydrogen demand in different sectors.

The first series identified various key challenges that need to be addressed in meeting national ambitions and has called out funding, hydrogen standards, electrolysers manufacturing, creation of carbon market and hydrogen clusters as immediate priorities for India.

The 15 GW capacity ambition is one the of three scenarios that IH2A considered for arriving at the indicative national figures. It also gave a probable break-up for setting up 15 GW capacity, consisting of three 2 GW, six 1 GW, and six to seven 400 MW to 500 MW installed electrolyser capacity at eight to nine national green hydrogen hubs or clusters.

The remaining two scenarios were to set up 25 GW and 35 GW electrolyser capacity in the next 10 years. It is important to note here that these figures are indicative and are comparable to similar sized global projects for the same period.

RelatedPosts

New post style guide

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

Under the second scenario of installing 25 GW electrolyser capacity in 10 years, IH2A estimated that about $25 billion investment would be required. This capacity will produce 5 MMT of green hydrogen and require about 50 GW renewable energy capacity which could come from new hydrogen-dedicated RE capacity and about 22 GW from RE excess capacity.

This 25 GW could comprise eight 2 GW, eight 1 GW, and 8 to 10 400 MW to 500 MW installed electrolyser capacity at 12 to 16 national hydrogen clusters.

IH2A thinks that the second scenario is the more probable one among the three.

For the third case, it assumed the setting up of 35 GW electrolyser capacity by 2030 to produce 7 MMT of green hydrogen. IH2A noted that this would require about $35 billion investment from public and private sectors and a renewable energy capacity of about 70 GW.

This 35 GW capacity could consist of 10, 2 GW, and 10, 1 GW along with 10 to 12 400 to 500 MW electrolyser installed capacity at 20 national hydrogen hubs.

The stakeholder consultation covered the importance of a visionary national target that is critical to reducing the prices of green hydrogen, with a view expressed by some stakeholders that India should target 5 MT of domestic green hydrogen production by 2030 serving both existing and new applications.

Source : Jiffy360

Tags: Green fuels|green Hydrogen|Hydrogen fuels|Renewable energy
Previous Post

TCI Express planning drone delivery

Next Post

Coal India may delay price hike

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post

Coal India may delay price hike

Follow Maritime gateway

    Popular News

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Haryana CM flags off first goods train

    Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

    August 24, 2026
    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

    Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

    October 10, 2026

    Business

    No Content Available

    recent

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Edgistify Adds 68,000 Sq Ft Warehouse

    Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

    October 16, 2026
    National Strategic Trade Command Centre Opens

    National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

    October 16, 2026
    India’s Merchandise Exports Rise 23%

    India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

    October 16, 2026

    Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Follow Us

    © 2026 – Powered by .

    • Terms of Use
    • Privacy Policy
    • Manage Cookies
    • License
    No Result
    View All Result
    • Home

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.