• About
  • Advertise
  • Careers
Sunday, October 11, 2026
thebestfirms.com
Advertisement
  • Home
  • News
  • Articles
  • Ports
    • Bulk Ports
    • Containers
    • Equipment
  • Shipping
    • Tankers
    • NVOCC
    • Main Line Operators
    • Bunkering
  • Cargo
    • Containers
    • Dry Bulk
    • Air Cargo
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Logistics
    • Logistics Parks
    • Forwarding
    • Supply Chain
    • Warehousing
  • Transport
    • Rail
    • Trucking
    • Waterways
    • Inland Waterways
  • Government
    • Economy
    • Policy
    • Customs
  • EXIM
No Result
View All Result
Subscribe
thebestfirms.com
No Result
View All Result

Longest tunnel on the Delhi-Mumbai expressway nears completion

Written byheeren.tanna@gmail.com
March 11, 2025
in Asia, Logistics, News, Transport, Trucking
Reading Time: 2 mins read
Share on Facebook
Share on Twitter

The longest tunnel on the Delhi-Mumbai Expressway, passing through the Mukundra Hills Tiger Reserve in Rajasthan, is almost finished. This tunnel, the first of its kind in India, has eight lanes, divided into two parallel tubes, each with four lanes. It stretches 4.9 km in total, with 3.3 km underground and the remaining 1.6 km built using the cut-and-cover method.

According to a senior National Highways Authority of India (NHAI) official, only 60 metres of excavation remains for Tube-2 (Chechat to Kota), which will be completed within a month. After this, further excavation will be done to increase the tunnel’s width and height in certain sections.

  • Full excavation completion target: June 2025
  • Road construction and additional works to follow
  • Tunnel completion deadline: December 2025

The entire excavation is set to finish by June 2025, after which road construction and other infrastructure work will begin. The tunnel will be equipped with:

  • Modern lighting and sensors
  • Pollution control systems
  • AI-based monitoring
  • Supervisory control and data acquisition

Currently, some areas of the tunnel are narrower, but plans are in place to expand the width from 9 to 19 metres and the height from 8 to 11 metres by March 2025. Security measures, electrical systems, and communication facilities will also be installed.

The Delhi-Mumbai Expressway spans 1,350 km, connecting Mumbai and New Delhi. In Rajasthan, 327 km of the 373 km stretch is already operational. However, the interchanges still need to be built before some sections can open for traffic.

Tags: Delhi-Mumbai ExpresswayExpresswayTunnel
heeren.tanna@gmail.com

heeren.tanna@gmail.com

Related Posts

GRSE Delivers Guided Missile Frigate and ASW Vessel to Indian Navy 

GRSE Delivers Guided Missile Frigate and ASW Vessel to Indian Navy 

October 10, 2026
November 2008

India ship entry rules add salvage and pollution-response checks

October 10, 2026

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Digital Edition

Read Magazine

Popular News

New post style guide

October 9, 2026

GRSE Delivers Guided Missile Frigate and ASW Vessel to Indian Navy 

October 10, 2026

India ship entry rules add salvage and pollution-response checks

October 10, 2026

Inside PSA Chennai’s Next Phase of Growth

October 9, 2026

Digital Edition

Click here
[mc4wp_form]
Next Post

Vadhvan Port will be operational by 2030: Ajit Pawar

Maritimegateway-logo (1)

Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

[mc4wp_form]

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License
No Result
View All Result
  • Home

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.