• About
  • Advertise
  • Careers
Thursday, October 22, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Government
    • Customs & Border Regulations
    • Maritime & Shipping Economy
    • EXIM & International Trade
    • Government Policy & Regulation
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Government
    • Customs & Border Regulations
    • Maritime & Shipping Economy
    • EXIM & International Trade
    • Government Policy & Regulation
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

MUMBAI-AHMEDABAD HIGH-SPEED RAIL CORRIDOR TO BE READY IN SIX YEARS

by Maritimegateway
October 25, 2016
in News
Reading Time: 2 mins read
A A
High Speed Rail Corridor

[vc_row]

Mumbai-Ahmedabad high-speed rail corridor would be completed in six years and its fare will be less than airfare, Railway Minister Suresh Prabhu said today.

Maintaining that the project is doable, Prabhu said in the Lok Sabha during Question Hour that the high-speed train project would be cost-effective.

The bullet train is expected to cover 508 km between Mumbai and Ahmedabad in about two hours, running at a maximum speed of 350 kmph and operating speed of 320 kmph. At present, Duronto Express takes about seven hours to cover the distance between the two financial centres.

‘No regional bias’

When it was pointed out that huge funds has been given for the project which might hamper those in other parts of the country, Prabhu said “there was no regional bias, Every state has got more than double than earlier.”

RelatedPosts

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

The project has been sanctioned with technical and financial assistance from the government of Japan and the joint feasibility study has already been done by Japanese International Agency.

Estimated to cost about Rs.97,636 crore, 81 per cent of the funding for the 508 km long Mumbai-Ahmedabad high-speed rail corridor project will come in form of a loan from Japan.

Soft loan from Japan

The project cost includes possible cost escalation, interest during construction and import duties.

The project is being funded by Japan with a soft loan for 50 years at 0.1 per cent annual interest with 15 years’ moratorium. Rolling stock and other equipment like signalling and power system will be imported from Japan as per the loan agreement.

The Railways has spelt out its policy with regard to running of high speed and semi-high-speed trains by identification of potential routes for both kinds of train services.

Feasibility studies

Prabhu said feasibility studies for other high speed corridors have been awarded to various railway companies.

Delhi-Mumbai high-speed corridor has been awarded to the consortium of the Third Railway Survey and Design Institute Group Corporation (Chinese consultant) and Lahmeyer International from India. Feasibility studies of high-speed corridors on Mumbai-Chennai, Delhi-Kolkata, Delhi-Nagpur and Mumbai-Nagpur have also been awarded to different global consultants.

[/vc_column_text][/vc_row]

Previous Post

CABINET GIVES IN-PRINCIPLE NOD FOR CONSTRUCTION OF ENAYAM PORT

Next Post

LANKAN PM PUSHES FOR CLOSER ECONOMIC TIES WITH TAMIL NADU AND SOUTH INDIA

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
LANKAN PM PUSHES FOR CLOSER ECONOMIC TIES WITH TAMIL NADU AND SOUTH INDIA

LANKAN PM PUSHES FOR CLOSER ECONOMIC TIES WITH TAMIL NADU AND SOUTH INDIA

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026
Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure

Aramex Signs MoU with GMR Airports to Build Express Cargo Infrastructure by March 2027

October 15, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026

Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Follow Us

© 2026 – Powered by .

  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License
No Result
View All Result
  • Home

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.