• About
  • Advertise
  • Careers
Monday, November 23, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
Editorial & Insights
Articles & Analysis

SLPA Phase 5 construction commences

by Maritimegateway
December 2, 2020
in Articles & Analysis
Reading Time: 2 mins read
A A

Warning: Trying to access array offset on false in /home/u380631772/domains/thebestfirms.com/public_html/wp-content/themes/jnews/class/Image/ImageNormalLoad.php on line 70

Warning: Trying to access array offset on false in /home/u380631772/domains/thebestfirms.com/public_html/wp-content/themes/jnews/class/Image/ImageNormalLoad.php on line 73

December 2, 2020: The construction of the Phase 5 of the Jaya Container Terminal (JCT) of the Sri Lanka Ports Authority (SLPA) commenced yesterday, adding a new chapter to the history of Sri Lanka’s ports and shipping industry.

The event was held with the initiative of Ports and Shipping Minister Rohitha Abeygunawardena and with the participation of Warehouse Facilities, Container Yards, Port Supply Facilities and Boats and Shipping Industry Development State Minister Jayantha Samaraweera and SLPA Chairman General Daya Ratnayake at the Phase 4 of the Jaya Container Terminal (JCT) of the SLPA . Development of the JCT commenced in March 1983. The first Phase of the terminal was opened in 1985, the second in 1987, the third in 1995 and the fourth in 1996.

SLPA Chairman General Daya Ratnayake said that the golden era of the port and shipping industry in Sri Lanka from 2005 to 2015 would re-commence with the construction of Phase 5.

State Minister Jayantha Samaraweera said that the era of loss caused by the loss of the Hambantota Port had ended and a new era of port development had begun with the phase 5.

Minister Rohitha Abeygunawardena said that the JCT Phase 5 was initiated by the previous government.

“Although the construction of phase 5 of the terminal was to be completed first, the previous government had stopped the constructions by giving priority to the import of Gantry cranes. The construction of the phase 5 of the terminal has commenced today because we received the cranes,” he said.

RelatedPosts

Inside PSA Chennai’s Next Phase of Growth

WinGD Keeps Every Fuel Pathway Open for Shipowners

Efficiency First: Wärtsilä’s Case for Smarter Propulsion

More Boxes, Smarter Decks: MacGregor’s Plan for Container Shipping

He added that despite the protests over the construction of the breakwater for the Colombo South Port and the construction of the Colombo International Terminal (CICT), none of those new projects would have been launched at present, if the breakwater had not been constructed. “The Colombo Port will be more efficient in the future with complete construction and commissioning of the East Container Terminal (ECT) as well as the West Container Terminal (WCT). These will lead Sri Lanka to be the maritime hub of Asia,” the Minister said.

The Minister said that he had the responsibility as the Minister in charge, to attract foreign exchange into the country by developing the Port as an economic hub taking timely decisions, realising the “Vision of Prosperity” of President Gotabaya Rajapaksa.

The JCT Phase 5, which commenced on December 1, will be completed by July 2022. The total value of this project is US $ 32 million. The consultancy for the project is to be provided by the SLPA Contract and Planning Engineering Division.

The construction company for the project is China Harbor Engineering Company Limited (CHEC).

The Phase 5 will add a number of advantages to SLPA operations and the Port. The length of the phase 5 terminal will avoid obstacles at the edge JCT phase 4 when providing anchorage facilities for ships with 366 meters in length.

The additional length of 120 meters that would be added by the phase 5 will result in an efficient and effective operation of vessels at the JCT. A new yard area of 40,000 square meters will also be added to the JCT with the Phase 5.

Secretary to the Ports and Shipping Ministry U.D.C. Jayalal, Secretary to the State Ministry of Warehouse Facilities, Container Yards, Port Supply Facilities and Boats and Shipping Industry Development Dhammika Matararachchi, SLPA Vice Chairman Dr. Prasantha Jayamanne, Managing Director H.D.A.S. Premachandra, Directors and Heads of Divisions, Higher Officials of China Harbor Engineering Company Limited and SLPA senior officials were present.

Source: Daily News

Tags: Jaya Container Terminal (JCT)Sri Lanka Port Authority
Previous Post

AP govt to finalise tenders for three ports soon

Next Post

DFC link from Kanpur to Gujarat Ports will open in a year

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post

DFC link from Kanpur to Gujarat Ports will open in a year

Follow Maritime gateway

    Popular News

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026

    Dirty fuels stage a comeback as emissions targets loom

    June 3, 2021
    Paradip Port Cargo Handling Push Targets Over 170 Million Tonnes in FY27

    Paradip Port Cargo Handling Push Targets Over 170 Million Tonnes in FY27

    October 16, 2026

    Business

    No Content Available

    recent

    New post style guide

    New post style guide

    October 27, 2026
    Paradip Port Targets 170 MMT Cargo

    Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

    October 16, 2026
    Edgistify Adds 68,000 Sq Ft Warehouse

    Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

    October 16, 2026
    National Strategic Trade Command Centre Opens

    National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

    October 16, 2026
    India’s Merchandise Exports Rise 23%

    India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

    October 16, 2026

    Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Site Links

    • Interviews
    • News
    • Government
    • Shipping
    • Cargo News

    Follow Us

    © 2026 – Powered by .

    • Terms of Use
    • Privacy Policy
    • Manage Cookies
    • License
    No Result
    View All Result
    • Home

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.