• About
  • Advertise
  • Careers
Saturday, October 24, 2026
Maritime Gateway
Advertisement
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
  • Home
  • Shipping
    • NVOCC
    • Tankers
  • Cargo
    • Air Cargo
    • Container Cargo
    • Dry Bulk
    • Liquid Bulk
    • LNG
    • Project Cargo
  • Global News
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle East
  • Ports & Terminals
    • Bulk Ports
    • Container Terminals
    • Port & Terminal Equipment
  • Logistics
    • Freight Forwarding
    • Logistics Parks
    • Supply Chain
    • Warehousing
  • Transport & Multimodal
    • Multimodal Transport
    • Rail
    • Trucking
    • Inland Waterways
  • Insights
    • Magazines
    • Interviews
    • Reports
    • Newsletters
    • Webinars
No Result
View All Result
Maritime Gateway
No Result
View All Result
Home
News

Surat–Chennai Expressway: Awards for over 250 km by April

by Kalpana Pandey
February 22, 2022
in News, Asia, EXIM & International Trade, Trucking
Reading Time: 3 mins read
A A

The economic corridor is among the projects, that are included to be tracked as part of Gati Shakti National Master Plan (NMP), launched by Prime Minister Narendra Modi in New Delhi In Oct 2021. NMP envisages breaking departmental silos and bringing in more holistic and integrated planning and execution of projects.

Chennai-Surat economic corridor is under various stages of execution in Tamil Nadu, Andhra, Telangana, Maharashtra, and Gujarat. Some of the packages have already reached the bid stage.

The project is envisioned as a combination of 2 partially access-controlled economic corridors (Chennai-Solapur and Solapur-Surat) and will include construction of greenfield stretches and upgrading brownfield sections.

The corridor will pass through Nashik, Ahmednagar, Solapur, Kalaburgi outskirts, Kurnool, Kadappa, and Tirupathi linking the states of Gujarat, Maharashtra, Karnataka, Telangana, and Tamil Nadu.

While the Surat –Solapur Economic Corridor (via Nashik – Ahmednagar ) will be 564 km long, the Solapur Chennai Economic Corridor (via Kurnool) will be 707 km.

The stretches between Surat and Ahmednagar via Nasik and Akkalkot-Mahabubnagar section that links Maharashtra with Telangana will be developed as greenfield alignments. The greenfield portion of the corridor will be close to 520 km. The rest of the corridor will upgrade existing two-lane roads.

RelatedPosts

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

Edgistify Adds 68,000 Sq Ft Warehouse at IndoSpace Luhari to Expand Gurugram Network

National Strategic Trade Command Centre Opens to Strengthen India’s Export Oversight

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

The project will be developed on Hybrid Annuity Model (HAM) that NHAI has preferred till recently. The project is estimated to cost anywhere between Rs 45,000 to Rs 50,000 crores.

Besides creating a third route by road between Chennai and Mumbai, the corridor seeks to reduce the distance roughly by 150 km between the two cities. Currently, heavy vehicles from Chennai and other parts of the State take a detour via Karnataka to reach Mumbai passing through a 1,604-km distance via Bengaluru, Tumukuru, Chitradurga, Davangere, Haveri, Belgaum, Kolhapur, Satara, and Pune. Alternatively, the second route via Nellore, Nalgonda, Hyderabad, Solapur, and Pune runs for 1,614 km.

Tender Progress

Leading infrastructure portal The Metro Rail has been tracking the progress of tenders in various packages across states.

Karnataka

In Karnataka, the NHAI has already floated tenders for three packages totalling 177 km The alignment in the state will be from Badadal village in Kalaburagi district to Singnodi in Raichur district.

  • Badabal village till Maradagi S Andola in Kalaburagi District -71km, tenders called for Rs 1,769 crore
  • Maradgi S Andola till Baswantpur in Yadgir district- 65.5 km tenders called for Rs 1,606 crore (Km 97 to 162.5)
  • Baswantpur till Singnodi in Raichur district- 40.6 km tenders called for Rs 1,169 crore

NHAI has received multiple bidders for at lest two of three packages.

A 26 km package from Akkalkot in Maharashtra to Badadal in Karnataka has not been tendered.

Telengana

NHAI has also tendered out both packages of the corridor in Telengana.

Package 1 (39.3 km): Karnataka-Telangana border at Raichur Gadwal road to Julekal village (km 202.900 to km 242.200) for Rs. 756.26 crore

Package 2 (38.2 km): Julekal village to Kurnool town terminating on NH-40 for Rs. 869.1 crores.

NHAI has received multiple bidders for both packages.

Source : Swarajya

Tags: Chennai-Surat economic corridorSurat–Chennai Expresswaytransport newstrucking news
Previous Post

Kakinada Port, associations write to Chandrababu Naidu over rice exports

Next Post

Sustainable terminal mulled for Patenga

Kalpana Pandey

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Next Post
Patenga terminal

Sustainable terminal mulled for Patenga

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
Haryana CM flags off first goods train

Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

August 24, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026

Popular News

Paradip Port Targets 170 MMT Cargo

Paradip Port Targets 170 MMT Cargo as PPA Reviews Infrastructure and Operational Efficiency

October 16, 2026
Haryana CM flags off first goods train

Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

August 24, 2026
Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels

Hooghly Cochin Shipyard Wins Repeat Order for Two Luxury River Cruise Vessels from Antara

October 10, 2026
India’s Merchandise Exports Rise 23%

India’s Merchandise Exports Rise 23% as First-Half Earnings Reach $259.89 Billion

October 16, 2026

Latest Shipping and logistics news covering marine, Ports, Shipping, Logistics, containers, dry bulk & tankers that drive South Asian maritime Industry.

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Site Links

  • Interviews
  • News
  • Government
  • Shipping
  • Cargo News

Follow Us

© 2026 – Powered by .

  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License
No Result
View All Result
  • Home

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.